2 meter long lead uk pin 9V Mains AC-DC Adaptor Power Supply Charger for AOSON M33 Android Tablet PC by chargers4all

41EbHmq3y7L

Get The Best Deal At Amazon
See Special Price
£8.09
 
BUY NOW

Good quality 2 meter long lead, Rohs Complaints,Use this Mains Adapter instead of Batteries and Save Money ££££££! 9V 2A good quality adaptors.Longest Mains Power adapter gives your child more room to play, Most cables available on the market are less than 1.5 metre long, making it difficult to power & play at the same time! Input: 100-240V AC 50/60Hz Output: 9V DC 2A DC Output Jack Diameter: 2.5mm Total Lead Length = 2 meter • Longer pin for better fit (most market chargers come with shorter pin resulting inconsistent charging) • Compatible with all Leapfrog products with power socket • Safety features such as SHORT CIRCUIT PROTECTION, OVERHEAT PROTECTION • PLEASE CHECK SPECIFICATIONS BEFORE YOU BUY AS WRONG POWER ADAPTER MAY DAMAGE YOUR DEVICE • FEEDBACK IS VERY IMPORTANT FOR ME, IF MY ITEMS IS FAULTY, PLEASE CONTACT WITH ME BEFORE LEAVE ME NEGATIVE FEEDBACK. THANKS FOR YOUR COOPERATION..

  • Good quality 2 meter long lead, Rohs Complaints,Use this Mains Adapter instead of Batteries and Save Money ££££££! 9V 2A good quality adaptors.Longest Mains Power adapter gives your child more room to play, Most cables available on the market are less than 1.5 metre long, making it difficult to power & play at the same time! Input: 100-240V AC 50/60Hz Output: 9V DC 2A DC Output Jack Diameter: 2.5mm Total Lead Length = 2 meter • Longer pin for better fit (most market chargers come with shorter pin resulting inconsistent charging) • Compatible with all Leapfrog products with power socket • Safety features such as SHORT CIRCUIT PROTECTION, OVERHEAT PROTECTION • PLEASE CHECK SPECIFICATIONS BEFORE YOU BUY AS WRONG POWER ADAPTER MAY DAMAGE YOUR DEVICE • FEEDBACK IS VERY IMPORTANT FOR ME, IF MY ITEMS IS FAULTY, PLEASE CONTACT WITH ME BEFORE LEAVE ME NEGATIVE FEEDBACK. THANKS FOR YOUR COOPERATION..